70% to passThe liquid-filled PV breaker has acted to relieve a vacuum in a tank. What action must be taken in regards to the PV-breaker before continuing operations?
A
Refill the breaker with liquid.
B
Install a new rupture disc.
C
Check to make certain that it has reset itself.
D
Manually reset the vacuum side of the breaker.
AI Explanation
The correct answer is A) Refill the breaker with liquid. The liquid-filled PV (pressure-vacuum) breaker is designed to relieve a vacuum in a tank by allowing air to enter the tank. If the liquid in the breaker has acted to relieve the vacuum, this means the liquid level has been depleted. Before continuing operations, the breaker must be refilled with the appropriate liquid to restore its functionality and ensure it can properly respond to future vacuum conditions in the tank. The other options are incorrect because they do not address the need to refill the depleted liquid in the breaker.
Related Questions
Q4204:You are aboard a single-screw vessel with a right-handed propeller. The vessel i...
Q940:What is a single fitting installed in a pipeline that either blanks off the pipe...
Q1901:How many ring life buoys must a small passenger vessel, of less than 65 feet in ...
Q1083:Your ship has loaded 22,000 barrels of crude oil, departing Valdez, Alaska for P...
Q4302:The DEEP DRILLER is loaded as shown in Sample Load Form #4 (Drilling). While the...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app