Question 1018 Deck General
70% to passThe liquid-filled PV breaker has acted to relieve a vacuum in a tank. What action must be taken in regards to the PV-breaker before continuing operations?
A
Refill the breaker with liquid.
B
Install a new rupture disc.
C
Check to make certain that it has reset itself.
D
Manually reset the vacuum side of the breaker.
AI Explanation
The correct answer is A) Refill the breaker with liquid. The liquid-filled PV (pressure-vacuum) breaker is designed to relieve a vacuum in a tank by allowing air to enter the tank. If the liquid in the breaker has acted to relieve the vacuum, this means the liquid level has been depleted. Before continuing operations, the breaker must be refilled with the appropriate liquid to restore its functionality and ensure it can properly respond to future vacuum conditions in the tank. The other options are incorrect because they do not address the need to refill the depleted liquid in the breaker.
Related Questions
Q@q.QuestionNumber:Cargo vessels being navigated, and fitted with emergency lighting and power syst...
Q@q.QuestionNumber:What percentage of the breaking strength is the generally accepted safe operatin...
Q@q.QuestionNumber:What is NOT required to be contained in the oil transfer procedures?
Q@q.QuestionNumber:What does the term "oil", as used in the U.S. regulations mean?
Q@q.QuestionNumber:The immersion suit requirements for MODU's apply to units operating in the Atlan...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App