Question 1326 Deck General
70% to passThe last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted _______________.
A
yellow/red/yellow
B
hi-visibility yellow
C
international orange
D
red/yellow/red
AI Explanation
The correct answer is D) red/yellow/red. The last 1.0 meter (3.3 feet) of vapor piping before the vessel vapor connection must be painted in the international color scheme of red/yellow/red. This color scheme is specified in the regulations to provide a clear visual indication of the hazardous nature of the vapor piping. The other answer choices, while potentially used for other purposes, do not meet the specific regulatory requirement for the color scheme of this critical section of the vapor piping.
Related Questions
Q3557:The major cause of anchor buoy pendant wire failures is _______________.
Q770:Vinyl chloride reacts dangerously with _______________.
Q4889:Aboard the DEEP DRILLER, the drill water pump may be used to provide drill water...
Q2248:Each pressure gauge used in an oil transfer operation must be accurate to within...
Q4913:What is the decrease in vertical moments for the Coastal Driller if 2.5 feet of ...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app