Question 1383 Deck General
70% to passWhile discharging a cargo, the stripping of the tanks falls behind schedule. What does this indicate?
A
main pumps are working at a high discharge pressure
B
stripping pump is not primed
C
stripping line is cross-connected to the main line
D
main pumps are leaving too much oil in the tanks
AI Explanation
The correct answer is D) main pumps are leaving too much oil in the tanks. When the stripping of the tanks falls behind schedule during cargo discharge, it indicates that the main pumps are not effectively removing all the oil from the tanks. This means the main pumps are leaving too much residual oil behind, which then needs to be removed by the slower stripping process. The other options are incorrect because they do not directly address the issue of insufficient removal of oil by the main pumps.
Related Questions
Q5055:On the DEEP DRILLER, to use the drill water pump to supplement the bilge pumps, ...
Q19:The "Mode" selector switch can be positioned and select all of the following EXC...
Q4590:For a floating MODU, the center of buoyancy and the metacenter are in the line o...
Q1072:You have berthed in a port area with other tank vessels. What signal is displaye...
Q1679:What is the name of tackle number 6 as shown in illustration D029DG below?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app