Question 1451 Deck General
70% to passWhen discharging a tanker, how can list be controlled?
A
by using wing tanks near the longitudinal center, discharging as necessary
B
by shoreside personnel
C
by using a center tank near the bow, discharging as necessary
D
by using the after peak tank, loading as necessary
AI Explanation
The correct answer is A) by using wing tanks near the longitudinal center, discharging as necessary. When discharging a tanker, the list can be controlled by using the wing tanks near the longitudinal center of the vessel. This allows for the even distribution of the remaining cargo, maintaining the vessel's stability and preventing excessive heel or list. The other options are not the most effective ways to control list during discharge operations. Using a center tank near the bow or the after peak tank would not provide the same level of longitudinal stability as the wing tanks near the center of the vessel.
Related Questions
Q@q.QuestionNumber:Who may approve cargo piping to pass through a machinery space for a barge desig...
Q@q.QuestionNumber:Use of air gaps in excess of that stated in the Limits of Elevated Service for t...
Q@q.QuestionNumber:For a semisubmersible moored in heavy weather conditions, the leeward lines shou...
Q@q.QuestionNumber:On small passenger vessels a gasoline engine must be fitted with ______________...
Q@q.QuestionNumber:What is the primary disadvantage of a permanent chain chaser system?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App