Question 152 Deck General
70% to passA vessel is loaded to her summer marks for a voyage from Montreal, Canada to Duluth, MN via the Great Lakes System. The voyage has been estimated to take nine (9
A
A
B
B
C
C
D
D
AI Explanation
The correct answer is T. The voyages through the Great Lakes System are governed by the Great Lakes Load Line Convention, which requires vessels to be loaded to their summer load lines. Since the vessel is loaded to her summer marks for the voyage from Montreal to Duluth, the answer is T, indicating that the vessel is properly loaded for the voyage. The other answer choices (A, B, C, D) do not correctly reflect the requirements for a voyage through the Great Lakes System, as they do not specify that the vessel is loaded to the appropriate summer load line.
Related Questions
Q5063:On the machinery deck of the COASTAL DRILLER, each watertight compartment has a...
Q4198:Your ship is dead in the water with the rudder amidships. As the right-handed sc...
Q2833:A vessel's Classification Certificate is issued by the _______________.
Q4534:The recessed areas on a wildcat are called _______________.
Q3321:Control of fire on a MODU should be addressed _______________.
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app