Question 3238 Deck General
70% to passThe shear rams of a MODU blowout preventer stack are used in emergency well control to _______________.
A
close and seal around casing
B
close and seal around the drill pipe
C
close and seal around drill collars
D
cut off pipe inside the preventer stack
AI Explanation
The correct answer is D) cut off pipe inside the preventer stack. The shear rams on a MODU (Mobile Offshore Drilling Unit) blowout preventer stack are designed to close and cut through the drill pipe in an emergency well control situation. This allows the well to be sealed off and the flow of oil or gas to be stopped, even if the drill pipe is inside the preventer stack. The other options, while related to blowout preventer function, do not accurately describe the purpose of the shear rams.
Related Questions
Q@q.QuestionNumber:Which method is used to detect rot in manila lines?
Q@q.QuestionNumber:What is a cofferdam?
Q@q.QuestionNumber:When the dew point of the outside air is lower than or equal to the dew point of...
Q@q.QuestionNumber:While in ocean transit, the COASTAL DRILLER has a roll period of 9 seconds. What...
Q@q.QuestionNumber:The complete details of a crude oil washing system aboard your vessel, including...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App