Question 4259 Deck General
70% to passWhen elevating the COASTAL DRILLER in 200 feet of water, the unit should be placed at an air gap of _______________.
A
35 feet
B
32 feet
C
30 feet
D
25 feet
AI Explanation
The correct answer is C) 30 feet. When elevating a COASTAL DRILLER in 200 feet of water, the unit should be placed at an air gap of 30 feet. This is in accordance with the regulations set forth by the US Coast Guard for the safe operation of offshore drilling units. The air gap ensures that there is sufficient clearance between the top of the unit and the water's surface, providing a safety buffer in case of unforeseen events or wave action. The other options, while potentially reasonable in some scenarios, do not align with the specific requirements for a COASTAL DRILLER in 200 feet of water.
Related Questions
Q@q.QuestionNumber:While on watch at sea you must maintain a proper lookout at all times. On a 700-...
Q@q.QuestionNumber:Which two components pass through the shank of an LWT anchor?
Q@q.QuestionNumber:The COASTAL DRILLER is elevated to an air gap of 25 feet in 250 feet of water. ...
Q@q.QuestionNumber:You are transporting dangerous cargo on your vessel. The Dangerous Cargo Manife...
Q@q.QuestionNumber:Your vessel is 79 feet long with 20 people aboard. The coaming of a deck above t...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App