Question 4283 Deck General
70% to passIn the event the motion of the DEEP DRILLER is such that critical motion limits are exceeded, you should _______________.
A
shift loads to increase KG
B
place the unit at 45 foot draft
C
place the unit in standby
D
place the unit at 65 foot draft
AI Explanation
The correct answer is B) place the unit at 45 foot draft. When the motion of the DEEP DRILLER exceeds critical motion limits, the proper action is to place the unit at a 45 foot draft. This is because a 45 foot draft provides the most stable configuration for the unit, reducing the risk of exceeding motion limits and ensuring the safety of the operation. The other answer choices are not correct. Shifting loads to increase KG (A) may not be enough to address the critical motion issues. Placing the unit in standby (C) or at a 65 foot draft (D) would not provide the necessary stability to mitigate the excessive motion.
Related Questions
Q@q.QuestionNumber:How many fathoms are in a shot of anchor cable?
Q@q.QuestionNumber:On a semisubmersible drilling unit, decreasing riser tension reduces __________...
Q@q.QuestionNumber:The document that certifies the correctness of the load line marks on a MODU is ...
Q@q.QuestionNumber:Small passenger vessels in coastwise service must carry approved ______________...
Q@q.QuestionNumber:You are lifting a 3-ton weight with a single whip rove on a swinging boom set at...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App