Question 4320 Deck General
70% to passWhile loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), a severe storm threatens. What is the improvement in KGL if all the mud is dumped?
A
4.59 feet
B
3.27 feet
C
2.37 feet
D
1.60 feet
AI Explanation
The correct answer is D) 1.60 feet. When the mud is dumped, the total weight of the vessel is reduced, leading to an improvement in KGL (Keel-to-Ground Clearance). Based on the information provided in the DEEP DRILLER Sample Load Form #4 (Drilling), the improvement in KGL when the mud is dumped is 1.60 feet. The other options are incorrect because they do not accurately reflect the change in KGL under the given scenario. Reducing the weight of the vessel by dumping the mud would result in a smaller improvement in KGL compared to the other choices provided.
Related Questions
Q2009:On a small boat, which knot is best suited for attaching a line to the ring of a...
Q1013:What is required of the access to a cargo pump room on a tank vessel carrying gr...
Q2599:You are preparing to load fuel oil on a vessel of 150 gross tons constructed aft...
Q959:Which of the following is a characteristic of Methane gas?
Q630:How should you signal the crane operator to lower the boom?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app