Question 4320 Deck General
70% to passWhile loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), a severe storm threatens. What is the improvement in KGL if all the mud is dumped?
A
4.59 feet
B
3.27 feet
C
2.37 feet
D
1.60 feet
AI Explanation
The correct answer is D) 1.60 feet. When the mud is dumped, the total weight of the vessel is reduced, leading to an improvement in KGL (Keel-to-Ground Clearance). Based on the information provided in the DEEP DRILLER Sample Load Form #4 (Drilling), the improvement in KGL when the mud is dumped is 1.60 feet. The other options are incorrect because they do not accurately reflect the change in KGL under the given scenario. Reducing the weight of the vessel by dumping the mud would result in a smaller improvement in KGL compared to the other choices provided.
Related Questions
Q918:The most important safety consideration during loading or discharge aboard a Ro-...
Q5067:The effect of ocean currents is usually more evident on a rig being towed than o...
Q1644:Which knot in illustration D030DG below is secure only when there is a strain on...
Q4090:You are arriving in port and are assigned to anchor in anchorage circle B-4. It ...
Q2718:What do regulations allow to be marked with EITHER the name of the fishing vesse...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app