Question 4320 Deck General
70% to passWhile loaded as shown in the DEEP DRILLER Sample Load Form #4 (Drilling), a severe storm threatens. What is the improvement in KGL if all the mud is dumped?
A
4.59 feet
B
3.27 feet
C
2.37 feet
D
1.60 feet
AI Explanation
The correct answer is D) 1.60 feet. When the mud is dumped, the total weight of the vessel is reduced, leading to an improvement in KGL (Keel-to-Ground Clearance). Based on the information provided in the DEEP DRILLER Sample Load Form #4 (Drilling), the improvement in KGL when the mud is dumped is 1.60 feet. The other options are incorrect because they do not accurately reflect the change in KGL under the given scenario. Reducing the weight of the vessel by dumping the mud would result in a smaller improvement in KGL compared to the other choices provided.
Related Questions
Q@q.QuestionNumber:When a helmsman receives the command "Right 15 degrees rudder," What should the ...
Q@q.QuestionNumber:You are on a large merchant vessel entering a U.S. port. There is a Pilot on boa...
Q@q.QuestionNumber:The intakes for an air compressor on a tank vessel carrying grade A cargo may be...
Q@q.QuestionNumber:What are the maximum vertical moments, including free surface moments, permitted...
Q@q.QuestionNumber:The regulations regarding Oil Record Books do not apply to MODU's that ________...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App