70% to passOn the DEEP DRILLER, when using the starboard #2 ballast pump to provide water to the main deck from the sea, it is necessary to open valves _______________.
A
38, 47, 45, 46
B
37, 36, 46, 47
C
37, 35, 36, 45
D
38, 47
AI Explanation
The correct answer is C) 37, 35, 36, 45. To provide water to the main deck from the sea using the starboard #2 ballast pump on the DEEP DRILLER, the valves that need to be opened are 37, 35, 36, and 45. This sequence allows the water to be drawn from the sea, pass through the ballast pump, and be delivered to the main deck. The other answer options are incorrect because: A) and B) do not include the necessary valve 35 in the sequence. D) is missing several valves required to complete the full flow path.
Related Questions
Q@q.QuestionNumber:Curve B in the Design Limits of Legs Chart of the Coastal Driller Operating Manu...
Q@q.QuestionNumber:You are using tackle number 3 as shown in illustration D029DG below to lift a we...
Q@q.QuestionNumber:Your non-oceangoing vessel is required to have a fixed piping system to discharg...
Q@q.QuestionNumber:What should be done immediately after putting down the stern ramp on a Ro-Ro ves...
Q@q.QuestionNumber:You have loaded dangerous cargo on your vessel and must fill out a Dangerous Ca...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App