Question 4462 Deck General
70% to passThe DEEP DRILLER is loaded as shown in Sample Load Form #4, (Drilling). In preparing for approaching heavy weather, the four leeward mooring lines are slacked. These actions reduce the _______________.
A
metacentric height
B
height of the righting arm
C
natural pitch period
D
righting moment
AI Explanation
The correct answer is C) natural pitch period. Slacking the leeward mooring lines reduces the righting moment acting on the vessel, which in turn increases the natural pitch period. This is because the reduced righting moment allows the vessel to pitch more freely, leading to a longer natural pitch period. The other options are incorrect because: A) Metacentric height is not directly affected by slacking the mooring lines. B) The height of the righting arm is also not directly affected by slacking the mooring lines. D) The righting moment is actually reduced by slacking the mooring lines, not increased.
Related Questions
Q@q.QuestionNumber:Two individuals authorized to serve as a lifeboatman must be assigned to any li...
Q@q.QuestionNumber:You are the operator of a 290 GRT uninspected towing vessel whose construction w...
Q@q.QuestionNumber:Which of the following would be the most probable location to encounter explosiv...
Q@q.QuestionNumber:"Ice blink" is _______________.
Q@q.QuestionNumber:What is the standard net barrel for petroleum products?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App