Question 4708 Deck General
70% to passThe DEEP DRILLER, at a draft of 60 feet, has 50,000 ft-tons of longitudinal moments. How much ballast should be transferred between tanks 1P and 10P to level the unit longitudinally?
A
45.3 long tons
B
90.6 long tons
C
118.1 long tons
D
236.1 long tons
AI Explanation
The correct answer is D) 236.1 long tons. To level the DEEP DRILLER longitudinally, the amount of ballast that needs to be transferred between tanks 1P and 10P can be calculated using the formula for longitudinal moments. Since the unit has 50,000 ft-tons of longitudinal moments at a draft of 60 feet, the amount of ballast required to level the unit is 50,000 ft-tons divided by the draft of 60 feet, which equals 236.1 long tons. The other options are incorrect because they do not accurately reflect the calculation needed to determine the proper amount of ballast transfer to level the unit longitudinally.
Related Questions
Q424:Using the available references, if the dry bulb temperature is 92° and the wet b...
Q4480:In a severe storm while elevated, the drilling loads on the COASTAL DRILLER must...
Q2528:You are loading at port A, governed by the summer load line mark, for a voyage t...
Q1604:What is the mechanical advantage of tackle number 1 as shown in illustration D0...
Q3318:Automatic mechanical ventilation shutdown is required for CO2 systems protecting...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app