70% to passThe DEEP DRILLER, loaded as shown in Sample Load Form #4 (Drilling), suffers major damage which results in flooding in tank C3S. Your best countermeasure is to _______________.
A
counterflood in 10S
B
counterflood in 1P
C
pump from C3S
D
pump from 9S
AI Explanation
The correct answer is D) pump from 9S. In the event of flooding in a tank, the primary countermeasure is to pump out the flooded tank to restore the vessel's stability and prevent further listing or capsizing. Pumping from the flooded tank (C3S) directly addresses the source of the flooding and is the most effective way to mitigate the situation. The other options are incorrect because counterflooding (adding water to an intact tank) would further destabilize the vessel, and pumping from other tanks (10S or 1P) would not directly address the flooding in C3S.
Related Questions
Q@q.QuestionNumber:A MODU required to carry an Oil Record Book must maintain the book on board for ...
Q@q.QuestionNumber:During loading, what is the minimum pressure required to be maintained by the in...
Q@q.QuestionNumber:When piloting a vessel, how are visual references used to establish a constant r...
Q@q.QuestionNumber:Under the regulations implementing MARPOL, a mobile offshore drilling unit is re...
Q@q.QuestionNumber:A load line for a MODU is assigned by the _______________.
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App