Question 708 Deck General
70% to passU.S. regulations require a responsible person to be present at all times when the hatches of spaces containing Class 1 explosive materials are open. When is the responsible person released from the duty of attendance?
A
when the final paperwork has been completed for the Class 1 Explosives in the hold
B
when all cargo operations have been completed and the vessel is ready to depart
C
when the responsible person has been relieved by another officer
D
when the hatches for the hold containing Class 1 Explosives have been secured
AI Explanation
The correct answer is D) when the hatches for the hold containing Class 1 Explosives have been secured. The regulation requires a responsible person to be present at all times when the hatches of spaces containing Class 1 explosive materials are open. This is to ensure the safety and security of the explosives. Once the hatches have been secured, the responsible person's duty of attendance is released, as the explosives are no longer accessible. The other answer choices do not address the specific requirement of the hatches being secured, which is the key factor in relieving the responsible person's duty.
Related Questions
Q@q.QuestionNumber:While on duty as a look-out, which other duty may you perform?
Q@q.QuestionNumber:The DEEP DRILLER is loaded as shown in the Sample Load Form #1 (Transit). What ...
Q@q.QuestionNumber:An inflatable liferaft equipped with a SOLAS B pack must be stowed ____________...
Q@q.QuestionNumber:According to 46 CFR Subchapter T, where practicable carburetor drip collectors s...
Q@q.QuestionNumber:The DEEP DRILLER is loaded as shown in the Sample Load Form #1 (Transit). What ...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Want to practice with timed exams?
Download Coast Guard Exams for the full exam experience with progress tracking.
Get the App