Question 95 Deck General
70% to passAssuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatch No. 3 while using a single belt loader to arrive at a desired mean keel draft of 27'-07"? (Use the Guidance Manual for Loading M.V. GRAND HAVEN.)
A
2500 tons
B
2550 tons
C
2600 tons
D
2650 tons
AI Explanation
The correct answer is A) 2500 tons. According to the Guidance Manual for Loading M.V. GRAND HAVEN, the recommended hatch loading sequence should be followed to achieve the desired mean keel draft of 27'-07". Assuming this sequence is followed, the maximum weight of iron ore that can be loaded through hatch No. 3 using a single belt loader is 2500 long tons. The other options are incorrect because they exceed the maximum allowable load for hatch No. 3 based on the guidance provided in the manual.
Related Questions
Q2662:What is the minimum number of Type B-II hand portable fire extinguishers require...
Q1657:Storage batteries on "T-Boats" must be located _______________.
Q1964:You are preparing to lubricate standing rigging on your vessel. When rigging a b...
Q4948:What is the change in longitudinal moments for the Coastal Driller if 2.0 feet o...
Q4312:While elevated as shown in Sample Load Form #3 (Drilling), winds are 57 knots an...
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app