Question 995 Deck General
70% to passIf your asphalt barge has operated more than 12 months in saltwater in the 24 month period since it was last dry-docked, when is it required to be hauled out again?
A
12 months since last dry-docking
B
18 months since last dry-docking
C
24 months since last dry-docking
D
36 months since last dry-docking
AI Explanation
The correct answer is D) 36 months since last dry-docking. According to the US Coast Guard regulations, an asphalt barge that has operated more than 12 months in saltwater within a 24-month period since its last dry-docking is required to be hauled out again every 36 months. This is the standard dry-docking interval for barges operating in saltwater, as the saltwater environment can accelerate the deterioration of the barge's hull and underwater components. The other options are incorrect because they do not align with the 36-month dry-docking requirement for barges in saltwater service.
Related Questions
Q296:There is a large shipment of case goods available to be loaded on your vessel. Y...
Q3223:What danger is presented if a waterspout passes over a MODU?
Q977:To determine which grades of cargo a tank vessel is permitted to carry you shoul...
Q3071:A ballasted vessel sinks enroute to a dry dock. Under these circumstances, the v...
Q2031:Which type of line is best able to withstand sudden shock loads?
Ready to test your knowledge?
Take a Deck General Practice Exam
Official Resources
Pass Your Coast Guard Licensing Exams!
Study offline, track your progress, and simulate real exams with the Coast Guard Exams app