Question 11General Subjects - Assistant Engineer
70% to passWhich of the following deballasting operations performed in conjunction with loading cargo could be accomplished without the use of a ballast pump?
ADraining a salt water ballast tank located above the waterline.
BFilling a salt water ballast tank located below the waterline.
CFilling a salt water ballast tank located above the waterline.
DDraining a salt water ballast tank located below the waterline.
AI Explanation
The correct answer is A) Draining a salt water ballast tank located above the waterline. This is because a ballast pump is not needed to drain a salt water ballast tank located above the waterline. The force of gravity alone can be used to drain such a tank, as the water will naturally flow out of the tank without the need for a pump. In contrast, the other options (B, C, and D) would require the use of a ballast pump to either fill or drain a ballast tank located below the waterline, as the water would not flow freely due to the hydrostatic pressure.
Related Questions
Q81:Which bearing will carry the load on two small points diametrically opposite to ... Q664:The rudder torque capacity of the four ram steering gear illustrated is rated at... Q355:What statement is true with respect to the back of a propeller blade? Q42:Which of the following problems would be the probable cause for the faulty opera... Q54:Which of the following illustrations represents the proper method of circuit gro...
Ready to test your knowledge?
Take a General Subjects - Assistant Engineer Practice ExamOfficial Resources