Question 146Refrigeration & AC - 1st Asst/Chief
70% to passTo prevent the unnecessary loading of an air conditioning system while maintaining the designed dry bulb temperature and relative humidity in an air conditioning system, what should be done?
Areduce the air reheating system load
Blower the compressor head pressure
Coperate the purge recovery unit continuously
Dadmit only enough fresh outside air to provide proper ventilation
AI Explanation
The correct answer is D) admit only enough fresh outside air to provide proper ventilation. The key to preventing unnecessary loading of the air conditioning system is to only bring in the minimum amount of fresh outside air required for proper ventilation. This helps maintain the designed dry bulb temperature and relative humidity without overtaxing the system. The other options would not directly address the goal of minimizing fresh air intake while still providing adequate ventilation. Reducing air reheating (A) or lowering compressor head pressure (B) would not necessarily reduce the fresh air intake. Operating the purge recovery unit continuously (C) is not directly related to fresh air intake control.
Related Questions
Q198:What is true concerning highly contaminated refrigerant recovered from burned ou... Q121:In a refrigeration system, the bulb for the thermal expansion valve is always lo... Q163:Why can CFC or HCFC refrigerants leaking into a confined space or in limited sur... Q63:As shown in the illustrated LP centrifugal chiller high efficiency purge recover... Q160:In the presence of an open flame or hot surfaces, chlorinated fluorocarbon refri...
Ready to test your knowledge?
Take a Refrigeration & AC - 1st Asst/Chief Practice ExamOfficial Resources