Question 28Safety & Environmental - 1st Asst/Chief
70% to passFor all loading operations, the terminal must supply the vessel with a means in which the vessel's designated person-in-charge may stop the flow of oil to the vessel, insuring immediate shutdown in the event of a hose rupture, tank overflow, etc. This means of control may be activated _______________.
The correct answer is D) all of the above. The means of control for stopping the flow of oil during a loading operation must be able to be activated pneumatically, mechanically, or electrically, including via a dedicated communications device. This requirement is specified in the regulations for vessel oil transfer operations under 33 CFR 156.120(i). The ability to immediately stop the flow of oil through multiple methods helps ensure safe and reliable shutdown in the event of an emergency, such as a hose rupture or tank overflow. The other answer choices are incorrect because they do not fully encompass the regulatory requirements for the means of control.
Ready to test your knowledge?
Take a Safety & Environmental - 1st Asst/Chief Practice ExamWant to practice with timed exams?
Download Coast Guard Exams for the full exam experience.
Get the App