Question 166Steam Plants - 1st Asst/Chief
70% to passA water-tube boiler can be laid up either wet or dry. If it is to be laid up wet, you should _______________.
Adrain and refill the boiler when the pH goes above 6
Bdrain and refill the boiler each week
Ccompletely fill the boiler with deaerated feed water and maintain a slight pressure
Dcompletely fill the boiler with water, then blow down to steaming level
AI Explanation
The correct answer is C) completely fill the boiler with deaerated feed water and maintain a slight pressure. When a water-tube boiler is laid up wet, it should be completely filled with deaerated feed water and a slight pressure should be maintained. This helps prevent corrosion and oxidation of the internal surfaces by keeping air out of the boiler. Draining and refilling the boiler periodically (options A and B) is not necessary when it is properly laid up with deaerated water and a slight pressure. Blowing down to the steaming level (option D) would leave part of the boiler exposed to air, increasing the risk of corrosion.
Related Questions
Q239:Which of the devices listed is used to keep overheated condensate from flowing t... Q339:The main propulsion turbine can be damaged by _______________. Q372:The reduction gear shown in the illustration is a/an _______________. Illustrati... Q233:Excess free oxygen in the boiler feed water can be the result of _______________... Q289:Which of the following statements represents the function of a turbine gland exh...
Ready to test your knowledge?
Take a Steam Plants - 1st Asst/Chief Practice ExamOfficial Resources