Question 41Steam Plants - 1st Asst/Chief
70% to passWhen preparing to hydrostatically test water-tube boilers, you should _______________.
Aremove all inspection plates and manhole covers as required by the marine inspector
Bmake arrangements for simultaneously testing main and auxiliary steam stops with water and steam pressure
Chave the boiler warmed to a temperature not exceeding 100°F
DD
AI Explanation
The correct answer is A) remove all inspection plates and manhole covers as required by the marine inspector. When preparing to hydrostatically test water-tube boilers, you should remove all inspection plates and manhole covers as required by the marine inspector. This allows the inspector to thoroughly inspect the interior of the boiler and ensure its integrity before the hydrostatic test is conducted. The other answer choices are incorrect because: B) is not necessary for the hydrostatic test itself, but may be required during other inspections. C) is not relevant, as the boiler should be at ambient temperature for the hydrostatic test.
Related Questions
Q350:To stop the rotor of a main turbine while underway at sea you should ___________... Q183:Which of the listed operating practices is considered as safe, and should be fol... Q370:An efficient seal is normally obtained between the upper and lower halves of a t... Q220:Fusible plugs are installed in fire-tube boilers to _______________. Q75:If oil is found in the main fuel oil heater steam drain system, which of the act...
Ready to test your knowledge?
Take a Steam Plants - 1st Asst/Chief Practice ExamOfficial Resources