Question 168Steam Plants - QMED
70% to passPrior to relieving the watch you should first check the fire room status by verifying the boiler steam drum level and _______________.
Aport and starboard settling tank levels
Bpreparing to blow tubes
Cinspecting the fires and burners
Dstack temperature
AI Explanation
The correct answer is C) inspecting the fires and burners. Before relieving the watch, it is crucial to check the status of the fire room, which includes verifying the boiler steam drum level and inspecting the fires and burners. This is a standard procedure for ensuring the safe and efficient operation of the boiler system. Checking the port and starboard settling tank levels (option A) or the stack temperature (option D) are not directly related to the immediate fire room status. Preparing to blow tubes (option B) is a separate maintenance task that is not part of the pre-watch relief check.
Related Questions
Q146:The source of metal particles adhering to the magnets in a lube oil strainer is ... Q84:In the illustrated exploded view of a pivoted shoe thrust bearing, identify the ... Q33:The cooling water flow from an air ejector inter condenser and after condenser i... Q56:In terms of the completeness of combustion, in viewing the condition of the stac... Q132:Most auxiliary turbine feed pumps do not require an external source of gland sea...
Ready to test your knowledge?
Take a Steam Plants - QMED Practice ExamOfficial Resources