Question 192Steam Plants - QMED
70% to passWhen performing a periodic gauge glass blow down to insure that the glass is free and operating correctly, what action is performed first?
AClose the bottom shut off valve and open the drain valve to clear out the bottom connection to the gauge glass.
BClose the top shut off valve and open the drain valve to clear out the bottom connection to the gauge glass.
CClose the bottom shut off valve and open the drain valve to clear out the top connection to the gauge glass.
DClose the top shut off valve and open the drain valve to clear out the top connection to the gauge glass.
AI Explanation
The correct answer is B) Close the top shut off valve and open the drain valve to clear out the bottom connection to the gauge glass. The reasoning for this is that when performing a periodic gauge glass blow down, the top shut off valve is closed first to isolate the gauge glass from the system pressure. This allows the bottom connection to the gauge glass to be cleared out by opening the drain valve, ensuring the glass is free and operating correctly. Closing the bottom valve first would not clear out the top connection, and closing the wrong valve entirely would not accomplish the intended purpose of the blow down. Therefore, option B is the correct procedure to follow.
Related Questions
Q122:What is the purpose of the item labeled "nozzle" located on the illustrated stea... Q20:What method of burner light-off presents the greatest danger to boiler flareback... Q1:If you noted a large difference in the pressures indicated by a duplex pressure ... Q68:Air in the main condenser is harmful because it will _______________. Q29:Which of the following labeled items of the illustrated section of boiler refrac...