Question 1099Deck General70% to pass
An LNG vessel containment system must be cooled down prior to loading cargo. Where are the cool-down parameters and rates obtained from?
AI Explanation
The correct answer is A) the instruction manual provided by the manufacturer of the containment system.
The cool-down parameters and rates for an LNG vessel's containment system are obtained from the manufacturer's instructions. This is because the manufacturer is the expert on the design, construction, and operation of the specific containment system installed on the vessel. They will have detailed technical information on the proper procedures and requirements for safely cooling down the system prior to loading cargo. The other options are not the authoritative source for this information.
Related Questions
#1097 A person may operate an air compressor in which of the following areas on board a tank barge? #1098 You have water washed your cargo tanks using the fixed machines. What should you do before using portable machines to clean areas screened from the wash of the fixed machine by structural members? #1100 What percent of oxygen content by volume, must each inert gas system be designed to supply the cargo tanks with a gas, or mixture of gases? #1101 Which is NOT a safety precaution to be observed during the loading of LFG? #1102 What is the Inert gas plant on an LNG vessel designed to produce?