Question 1184Deck General70% to pass
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the _______________.
AI Explanation
The correct answer is D) the tankerman or person in charge of loading.
The final inspection responsibility for ensuring that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the tankerman or person in charge of loading. This is because the tankerman or person in charge of loading is responsible for overseeing the entire loading operation and ensuring compliance with applicable regulations and safety requirements.
The other options are incorrect because the owner of the barge, the charterer through the Master of the towing vessel, and the terminal operator do not have the direct responsibility for the final inspection prior to loading the cargo.
Related Questions
#1182 The purpose of the deck seal in an inert gas system is to prevent _______________.#1183 During loading and discharging operations, in addition to when the cargo tanks have been properly filled, each inert gas system must be capable of maintaining a minimum gas pressure of _______________.#1185 A barge displaying a 2' X 3' white sign with the word "WARNING" followed by "DANGEROUS CARGO" in black letters _______________.#1186 Which barge in your tow would require a cargo information card to be carried in the pilothouse? #1187 An inert gas system is designed to reduce the possibility of tank explosions by _______________.