Question 1454Deck General70% to pass
While loading bulk liquid cargo, a tank valve jams open, what is the first action you should take?
AI Explanation
The correct answer is C) order the shore facility to shut down.
When a tank valve jams open during bulk liquid cargo loading, the first priority is to stop the flow of cargo and contain the spill. Ordering the shore facility to shut down the loading operation is the quickest way to stop the flow and prevent further spilling. This is in line with Coast Guard regulations that require immediate action to stop the release of hazardous cargo.
The other options are not the best first actions. Unplugging the deck scuppers (A) would allow the spill to spread, calling the chief engineer (B) takes time, and running out the fire hose (D) does not address the root cause of the issue.
Related Questions
#1452 "Line Displacement" is a procedure that is followed at an oil terminal facility, when there is a change of which of the following? #1453 When loading bulk liquid cargo, what is the first action you should take if a cargo valve jammed open? #1455 When stripping a tank, what is caused by excessive air in the suction line? #1456 What is the distance between the surface of the liquid and the tank top in a cargo tank called? #1457 Which of the following is equivalent to a "barrel", which is a unit of liquid measure?