Question 2334Deck General70% to pass
You are in the process of adding a barge to your tow. A line run from your power capstan and around timber heads on your tow is made fast on the new barge so that it can be pulled into position. This line is called a _______________.
AI Explanation
The correct answer is D) capstan line.
The capstan line is the line that is run from the power capstan on the towing vessel and around the timber heads on the tow, securing the new barge so that it can be pulled into position. This line is used to maneuver the barge and bring it into the desired position alongside the tow.
The other options are incorrect because:
A) A spring line is used to keep the tow from moving too far away from the towing vessel.
B) A fore and aft line is used to secure the tow's bow and stern to the towing vessel.
C) A scissors wire is used to stabilize the tow and prevent it from yawing.
Related Questions
#2332 In the United States, the load line markings are set by the _______________.#2333 When "checking down" a barge using a check line you should use _______________.#2335 A tankerman who permits or causes oil to go into a navigable waterway may be federally punished with which of the following? #2336 On an inspected vessel, which abbreviation refers to the horizontal distance between perpendiculars taken at the forward-most and the after-most points on the waterline at her deepest operating draft? #2337 A face line is used to _______________.