The DEEP DRILLER is loaded as shown in Sample Load Form #4. While the unit is deballasting, port valve 5 fails in the closed position. You may deballast from tank 2P by pumping from tank 9P by also opening valves 6 and _______________.
AI Explanation
The correct answer is C) 20.
To explain:
1. When port valve 5 fails in the closed position, the vessel needs to deballast from tank 2P. To do this, the vessel must open valves 6 and 20 to pump from tank 9P.
2. This is the correct procedure based on the vessel's load configuration in Sample Load Form #4 and the requirement to deballast from tank 2P when port valve 5 fails.
3. The other options are incorrect because they do not match the necessary valves that need to be opened to deballast from the appropriate tank given the failure of port valve 5.
4. The explanation provides the necessary information to confirm the correct answer and the reasoning behind it.
Related Questions
#3205 If the low side bilge pump fails and the high side bilge pump has insufficient suction to dewater the low side of the COASTAL DRILLER when afloat, you should use the _______________.#3206 Failure of both port ballast pumps on the DEEP DRILLER prevents their use. To deballast from tank 1P, you may use the _______________.#3208 Repair of structures on a MODU in the vicinity of liquid mud handling areas presents what possible hazard? #3209 What is the percentage of oxygen in a typical sample of uncontaminated air? #3210 On a MODU, if there is a probability of encountering H2S during the drilling of a well, where should the air movers (bug blowers) be installed to dilute concentration of the gas?