Question 3368Deck General70% to pass
While off-loading from an offshore supply vessel with the crane, the wind increases in strength and changes direction significantly, you should _______________.
AI Explanation
The correct answer is D) move the offshore supply vessel to the downwind side.
The reason this is the correct answer is that when the wind increases in strength and changes direction significantly during off-loading operations, it is crucial to reposition the offshore supply vessel to the downwind side. This reduces the risk of the vessel being blown into the structure or equipment during the off-loading process, which could lead to damage or injury. Moving the vessel to the downwind side provides more stability and control over the off-loading operation.
The other options are incorrect because: A) stopping off-loading but keeping the vessel in the same location does not address the changing wind conditions; B) continuing off-loading without any changes is unsafe given the increased wind; and C) expediting off-loading may lead to rushed, unsafe procedures.
Related Questions
#3366 What is the length of the catenary when the DEEP DRILLER is anchored in 600 feet of water and the anchor line tension is 170 kips? #3367 A permanent chain chasing system is used to _______________.#3369 What lighting characteristic is required of an obstruction light on a mobile offshore drilling unit on the waters of the U.S. Outer Continental Shelf? #3370 Given the same water depth and line tension, the length of the ground cable of a 90 pound/foot mooring chain compared to the length of the ground cable of a 19 pound/ft wire rope mooring line will be _______________.#3371 Leg penetration to depths which require pullout forces greater than that which can be supplied by the buoyancy of the hull may exist in _______________.