Question 3498Deck General70% to pass
Who has the ultimate responsibility for the safety of a mobile offshore drilling unit while it is being towed to a new location?
AI Explanation
The correct answer is B) The rig mover.
The ultimate responsibility for the safety of a mobile offshore drilling unit while it is being towed to a new location lies with the rig mover. This is because the rig mover is responsible for the overall coordination and management of the towing operation, which includes ensuring the safety of the unit during the transit. The rig mover is typically a specialized marine contractor with the necessary expertise and equipment to safely move the drilling unit.
The other options are incorrect because the Offshore Installation Manager is responsible for the safety of the unit while it is on location, the Pilot is responsible for the navigation and maneuvering of the towing vessel, and the marine surveyor is responsible for inspecting the condition of the unit and ensuring its seaworthiness, but not for the overall safety of the towing operation.
Related Questions
#3496 The COASTAL DRILLER is experiencing a single amplitude roll angle of 3 degrees and a roll period of 10 seconds. What is the maximum water depth that can be used for going on location? #3497 Scouring usually occurs with soils such as _______________.#3499 Among the possible causes of unexpected rapidly increasing inclination of the DEEP DRILLER while in transit is _______________.#3500 Yawing can be described as _______________.#3501 In observing rig motion while under tow, the period of roll is the time difference between _______________.