On the DEEP DRILLER, among the starboard-side valves to open when deballasting from ballast tank 8S is valve _______________.
AI Explanation
The correct answer is C) 17.
When deballasting from ballast tank 8S on the DEEP DRILLER, valve 17 on the starboard side needs to be opened. This is based on the typical valve arrangement and piping system on offshore drilling rigs, where the ballast tank valves are numbered sequentially, and valve 17 would be the corresponding valve for ballast tank 8S on the starboard side.
The other options are incorrect because valve 7 would be associated with a different ballast tank, valve 8 would be the port-side valve for the same tank, and valve 18 would be the next sequential valve after the correct valve 17.
Related Questions
#4239 To what distance below the hull must the legs of the COASTAL DRILLER be lowered in order to meet the stability and leg strength requirements during the wind speeds greater than 70 knots? #4240 During a long ocean tow of a jack-up the clearance in the upper guide should be reduced to zero to restrain the leg and eliminate the impact loads from dynamic responses. This is best done by _______________.#4242 What is the maximum weight that can be placed in the setback area on the COASTAL DRILLER? #4243 Among the equipment included in the DEEP DRILLER lightweight are the loading hoses, derrick, traveling block in the lowest position, anchors, all machinery with liquids to normal operating level, and _______________.#4244 If the charted water depth is 200 feet, the limits of service for the COASTAL DRILLER require an air gap of _______________.