Question 4245Deck General70% to pass
The hoist line primarily used for lifting personnel on MODU cranes is called the _______________.
AI Explanation
The correct answer is A) whip line.
The whip line is the primary hoist line used for lifting personnel on mobile offshore drilling unit (MODU) cranes. This is in accordance with regulations and industry standards for safe personnel handling on offshore platforms and vessels. The whip line is a dedicated, secondary hoist line that is separate from the main hoist line used for lifting heavy loads. This redundancy and specialized line helps ensure the safety of workers being lifted by the crane.
The other options are incorrect because: B) pendant is a separate rigging component not directly used for lifting personnel, C) personnel line is not a standard term, and D) main hoist line would not be the preferred choice for personnel lifting due to the potential for heavier loads and reduced safety redundancy.
Related Questions
#4243 Among the equipment included in the DEEP DRILLER lightweight are the loading hoses, derrick, traveling block in the lowest position, anchors, all machinery with liquids to normal operating level, and _______________.#4244 If the charted water depth is 200 feet, the limits of service for the COASTAL DRILLER require an air gap of _______________.#4246 Preloading tests the soil to the vertical leg reaction that would be imposed by _______________.#4247 The DEEP DRILLER is loaded as shown in the Sample Load Form #1 (Transit). According to the deck load graph, how much additional deck load could be added on the unit? #4248 Under ideal conditions, the DEEP DRILLER can pick up and place pipe in the rack at a rate of about _______________.