Question 4357Deck General70% to pass
On the DEEP DRILLER, among the valves to open when transferring ballast from Tank 10S to Tank 1P using the #2 ballast pump is valve _______________.
AI Explanation
The correct answer is A) 34 Port.
When transferring ballast from Tank 10S to Tank 1P using the #2 ballast pump on the DEEP DRILLER, valve 34 Port would need to be opened. This is because valve 34 Port connects the #2 ballast pump to Tank 10S, allowing the ballast to be transferred from that tank. The other options are incorrect because they do not correspond to the correct valve for this specific ballast transfer operation.
Related Questions
#4355 The DEEP DRILLER, at 60.0 feet draft in sea water, discharges 275.8 long tons. What is the new draft? #4356 On the DEEP DRILLER, among the valves to open when transferring ballast from Tank 10P to Tank 1S using the #2 ballast pump is valve _______________.#4358 On the DEEP DRILLER, among the starboard-side valves to open when deballasting from ballast tank 2S is valve _______________. #4359 The longitudinal distance between draft marks for the DEEP DRILLER is _______________.#4360 When leveling the elevated COASTAL DRILLER, you may raise the low corner instead of lowering the high corner _______________.