Question 4460Deck General70% to pass
The DEEP DRILLER is loaded as shown in the Sample Load Form #4 (Drilling). According to the deck load graph, how much additional deck load could be added on the unit?
AI Explanation
The correct answer is B) 461.87 long tons.
The reasoning is as follows:
According to the deck load graph provided in the Sample Load Form #4 (Drilling), the available deck load capacity for the DEEP DRILLER is 461.87 long tons. This means that the vessel can safely accommodate an additional 461.87 long tons of deck load, based on the current loading conditions shown in the form.
The other answer choices are incorrect because:
A) 561.87 long tons exceeds the available deck load capacity.
C) 281.34 long tons is less than the available deck load capacity.
D) 192.59 long tons is less than the available deck load capacity.
Related Questions
#4458 The marine riser on the DEEP DRILLER should be disconnected if it appears the ball joint angle will exceed 10° or the mooring line tensions will exceed _______________.#4459 The marine riser on the DEEP DRILLER should be disconnected if it appears the mooring line tensions will exceed 522 kips or the ball joint angle will exceed _______________.#4461 You should consider placing the drilling operations of the DEEP DRILLER in standby when _______________.#4462 The DEEP DRILLER is loaded as shown in Sample Load Form #4, (Drilling). In preparing for approaching heavy weather, the four leeward mooring lines are slacked. These actions reduce the _______________.#4463 For a semisubmersible moored in heavy weather conditions, the weather lines should be adjusted so that several lines carry about the same tension, and the leeward lines are _______________.