Question 4499Deck General70% to pass
In a combination chain and wire rope mooring system, the anchor chain is deployed at the anchor end of the line to _______________.
AI Explanation
The correct answer is A) increase the holding power.
The anchor chain is deployed at the anchor end of a combination chain and wire rope mooring system to increase the holding power of the overall mooring system. The weight and increased friction of the anchor chain on the seabed helps to secure the anchor and resist the forces acting on the mooring line, thereby enhancing the system's holding power.
The other options are incorrect because:
B) The anchor chain does not primarily function to reduce the catenary (curvature) of the mooring line.
C) The anchor chain does not directly increase the fatigue life of the mooring system.
D) The anchor chain does not reduce the time required to retrieve the mooring line.
Related Questions
#4497 The COASTAL DRILLER is elevated while preparing for the passage of a severe storm. With ideal loading, the static loading on each of the three legs would be 4,715 kips. However, the LCG is 121 feet AFO and TCG is 0.5 foot to starboard of the centerline. By how many kips does the starboard leg reaction exceed the ideal loading? #4498 The primary purpose for using stud link chain in a mooring system on a rig is the _______________.#4500 With adaptor blocks/chocks removed from an LWT stock anchor, the trip angle will be _______________.#4501 When anchoring in an area with a hard bottom, the fluke angle of an anchor should be set at _______________.#4502 With adaptor blocks/chocks in place on an LWT stock anchor, the trip angle will be _______________.