The DEEP DRILLER, while loaded as shown in the Sample Load Form #4 (Drilling), suffers damage to the port center column below the waterline. Among the tanks from which you should pump is tank _______________.
AI Explanation
The correct answer is A) 9P.
When a vessel like the DEEP DRILLER suffers damage to a column below the waterline, the recommended procedure is to pump out the ballast tank(s) associated with that column to help stabilize the vessel. Based on the Sample Load Form #4 provided, tank 9P is the port center column ballast tank, so this is the tank that should be pumped in this scenario.
The other answer choices are incorrect because they do not represent the ballast tank associated with the damaged port center column. 2S and 9S are likely other ballast tanks, but not the specific one needed to address the damage described.
Related Questions
#4592 Deck beams on a MODU are generally spaced at equal intervals and run _______________.#4593 The DEEP DRILLER, loaded as shown in Sample Load Form #5 (Survival), suffers major damage which results in flooding in tank C3S. Your best countermeasure is to _______________.#4595 A continual worsening of the list or trim of any floating MODU indicates _______________.#4596 A semisubmersible, with a TCG of 0.5 foot to port, displaces 20,000 long tons. Bulk, weighing 400 long tons, is loaded in P-tanks located 50 feet starboard to the centerline. What is the new TCG? #4597 In the DEEP DRILLER, VCG is obtained from the sum of the vertical moments by _______________.