Question 4599Deck General70% to pass
While the DEEP DRILLER is operating as shown in Sample Form #4 (Drilling), casing is accidentally dropped over the starboard side. If the starboard aft inclination is slowly increasing, which tank is probably damaged?
AI Explanation
The correct answer is D) 10S.
When the DEEP DRILLER is operating in the Drilling configuration as shown in Sample Form #4, and the starboard aft inclination is slowly increasing, this indicates that the starboard aft tank (10S) is likely damaged and taking on water. The increased inclination on the starboard side suggests a loss of buoyancy in that area, which would be caused by damage to the 10S tank.
The other answer choices are incorrect because they do not correspond to the tank that would be affected by the described scenario. Tanks 10P, 9S, and 8S are not located in the starboard aft section of the vessel, and therefore would not be the source of the increased inclination.
Related Questions
#4597 In the DEEP DRILLER, VCG is obtained from the sum of the vertical moments by _______________.#4598 The DEEP DRILLER suffers minor flooding of the port pump room. If both port bilge pumps fail to dewater the pump room, you should use the _______________.#4600 The analysis of damaged stability for the DEEP DRILLER, disregards the beneficial effects of countermeasures and _______________.#4601 The DEEP DRILLER is loaded as shown is Sample Load Form #4 (Drilling). What would be the change in vertical moments for Fresh Water if the entire contents of Drill Water Tank 5P are transferred to Drill Water Tank 5S? #4602 The DEEP DRILLER is observed to be level at a draft of 60.0 feet. At the same time, the calculated load form shows the displacement to be 17,845 long tons, total longitudinal moment 51,466 foot-kips, and total transverse moments -10,000 foot-kips. What is the transverse location of the missing load?