Question 4881Deck General70% to pass
The DEEP DRILLER suffers minor flooding of the port pump room while in transit. If both port bilge pumps fail to dewater the pump room, you may _______________.
AI Explanation
The correct answer is A) use port drill water pump.
The reasoning is that if both port bilge pumps fail to dewater the flooded port pump room, the next available option is to use the port drill water pump to remove the floodwater. The drill water pump is designed to be used as a backup dewatering system in the event of a failure of the primary bilge pumps.
The other options are incorrect because using the port ballast pumps (B) or the port saltwater service pump (C) would not be the most appropriate choice for dewatering the flooded pump room. Using the starboard ballast pumps and crossover system (D) would require additional steps and equipment that may not be as readily available in an emergency situation.
Related Questions
#4879 In the COASTAL DRILLER, TCG is obtained from the sum of the transverse moments by _______________.#4880 A floating MODU displacing 20,000 long tons with a VCG of 50 feet loads 100 long tons at 100 feet above the baseline and 200 long tons at 130 feet above the baseline. What is the new KG? #4882 A floating jack-up with displacement of 16,200 kips has its LCG 110.37 feet aft of frame zero (AF0 #4883 The rotary of the COASTAL DRILLER is located 34 feet aft of the transom and 2 feet to port of the centerline. With the changes to lightweight shown in the Operating Manual, the maximum allowable hook load is _______________.#4884 Weights added or discharged at the center of flotation on the COASTAL DRILLER while floating will change the _______________.