Question 4886Deck General70% to pass
During a long ocean tow of a jack-up the clearance in the upper guide should be reduced to zero to restrain the leg and eliminate the impact loads from dynamic responses. This is best done by _______________.
AI Explanation
The correct answer is A) tapering the upper guides and building up the teeth.
During a long ocean tow of a jack-up, the clearance in the upper guide should be reduced to zero to restrain the leg and eliminate the impact loads from dynamic responses. This is best achieved by tapering the upper guides and building up the teeth, as this allows the leg to be securely held in place and prevents excessive movement that could lead to impact loads.
The other options are incorrect because: B) removing certain lengths of the leg would not adequately restrain the movement, C) raising the spud cans into hull recesses would not address the clearance in the upper guides, and D) lowering the spud cans below the hull would not restrain the leg's movement during the tow.
Related Questions
#4884 Weights added or discharged at the center of flotation on the COASTAL DRILLER while floating will change the _______________.#4885 A jack-up, while level in transit at 10 feet draft, experiences a wind gust which results in a port draft of 11 feet. What is the new starboard draft? #4887 The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of 6 and 7 drill water tanks are discharged, what would be the new VCG? #4888 A jack-up 210 feet in length is level during transit. The LCF is 140 feet aft of the bow. How much weight should be applied at the bow to level the jack-up if 150 kips are loaded at the transom? #4889 Aboard the DEEP DRILLER, the drill water pump may be used to provide drill water to the deck and _______________.