Question 4907Deck General70% to pass
When the COASTAL DRILLER is loaded as shown in the sample load form Number 3 (drilling), the hook load is placed in the pipe racks. What would be the new variable load?
AI Explanation
The correct answer is C) 3,658.8 kips.
When the COASTAL DRILLER is loaded as shown in the sample load form Number 3 (drilling), the hook load is placed in the pipe racks. In this scenario, the new variable load would be the combined weight of the hook load and the pipe racks, which according to the information provided, is 3,658.8 kips.
The other answer choices are incorrect because:
A) 2,381.0 kips is too low and does not include the weight of the pipe racks.
B) 3,381.0 kips is too low and does not accurately reflect the total variable load.
D) 4,381.0 kips is too high and likely includes additional loads not specified in the scenario.
Related Questions
#4905 The COASTAL DRILLER, in ocean transit at a draft of 10 feet 0 inches with winds greater than 70 knots, has a KGT of 39.0 feet and a KGL of 38.6 feet. The margin on the maximum allowable KG is _______________.#4906 The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the drill water in drill water tanks 6 and 25 are discharged, what is the new draft? #4908 What should NOT be used as an indicator that ice may be nearby? #4909 The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of 6 and 7 drill water tanks are discharged, what is the new height of the center of gravity corrected for transverse free surface effects? #4910 When underway at a draft of 10.5 feet in a severe storm, the COASTAL DRILLER has a maximum allowed KG of _______________.