Question 4928Deck General70% to pass
To pump bilge water out of the port pump room on the DEEP DRILLER, using the number 2 bilge pump, open port-side valve _______________.
AI Explanation
The correct answer is D) 42.
To pump bilge water out of the port pump room on the DEEP DRILLER using the number 2 bilge pump, you would open valve 42 on the port side. This is because valve 42 is the valve that controls the discharge from the number 2 bilge pump, which is responsible for pumping out the port pump room.
The other answer choices are incorrect because they do not correspond to the valve that controls the discharge from the number 2 bilge pump on the port side. Valves 28, 36, and 41 are likely used for other purposes, such as controlling the discharge from other bilge pumps or ballast systems.
Related Questions
#4926 A MODU displacing 30,500 long tons has a KG of 60 feet. A weight of 500 long tons is discharged from a VCG of 150 feet. What is the change in KG? #4927 A jack-up has 8 inches of trim by the stern. Calculations show that the moment required to change trim one inch is 500 foot-kips. To level the unit, how far must a weight of 50 kips be transferred toward the bow? #4929 The COASTAL DRILLER, in transit during a severe storm while at a draft of 9 feet 6 inches, has a KGT of 39.1 feet and a KGL of 39.9 feet. The margin on the maximum allowable KG is _______________.#4930 An icebreaker assisting a vessel through an ice field would display a visual signal consisting of the code letter "S" (Sierra) to signify that "_______________". #4931 An icebreaker assisting a vessel through an ice field would display a visual signal consisting of the code letter "I" (India) to signify that "_______________"