Question 5061Deck General70% to pass
On the COASTAL DRILLER, the level of water in each of two pump bilge pits is monitored by hydrostatic alarm switches connected to a remote panel located in the _______________.
AI Explanation
The correct answer is B) OIM's office.
The OIM (Offshore Installation Manager) is responsible for the overall safety and operation of the offshore drilling unit, which includes monitoring the critical systems like the bilge pump system. The hydrostatic alarm switches connected to the bilge pits would typically be monitored in the OIM's office, as this is the central control and command center for the offshore unit.
The other answer choices are incorrect because:
A) The OIM's quarters is a personal living space, not the central control room.
C) The SCR (Switchgear Control Room) is typically for electrical distribution, not bilge monitoring.
D) The control house is a general term, but the OIM's office is the more specific and correct location for bilge monitoring.
Related Questions
#5059 The DEEP DRILLER suffers minor flooding of the starboard pump room while in transit. If both starboard bilge pumps fail to dewater the pump room, you may use _______________.#5060 How many independent bilge systems is the COASTAL DRILLER equipped with? #5062 On the COASTAL DRILLER, the level of water in each of two pump bilge pits is monitored by _______________.#5063 On the machinery deck of the COASTAL DRILLER, each watertight compartment has at least one sump valve that can be remotely operated from the _______________. #5064 On the COASTAL DRILLER, in case one of the two bilge pits is flooded, the other can operate through a(n) _______________.