Question 649Deck General70% to pass
Who should be notified prior to starting up a crane?
AI Explanation
The correct answer is C) The engine room.
The engine room should be notified prior to starting up a crane because the crane's operation can impact the ship's engine and propulsion systems. Proper coordination between the crane operator and the engine room is crucial to ensure the safe and effective operation of the crane without interfering with the ship's overall operations. The other options, such as the pumpman or the stevedore foreman, are not directly responsible for the ship's engines and propulsion, and therefore do not need to be notified before starting up the crane.
Related Questions
#647 Which of the following statements is TRUE regarding crane operations? #648 Which statement(s) is/are TRUE regarding the operation of a crane? #650 Which statement(s) is/are FALSE concerning crane cargo operations? #651 Which action(s) should the operator of a pedestal crane take if crane control is lost? #652 During which condition should the operator of a pedestal crane shutdown operations?