Question 1703Deck Safety70% to pass
Progressive flooding is controlled by securing watertight boundaries and _______________.
AI Explanation
The correct answer is B) pumping out flooded compartments.
Progressive flooding is controlled by securing watertight boundaries and actively pumping out any flooded compartments. This helps maintain the vessel's stability and prevent further ingress of water. Transferring water ballast (A) and jettisoning cargo (C) may be used in certain situations, but they are not the primary means of controlling progressive flooding. Abandoning ship (D) is a last resort measure, not a method for controlling progressive flooding.
Related Questions
#1701 Your vessel has been damaged and you must shore a bulkhead. You should cut the shore _______________.#1702 A crack in the deck plating of a vessel may be temporarily prevented from increasing in length by _______________.#1704 What must be accurately determined to assess the potential for progressive flooding after a vessel has been damaged? #1705 Which type of hull damage should be repaired FIRST? #1706 Repairing damage to the hull at or above the waterline reduces the threat of _______________.