Question 2459Deck Safety70% to pass

The SS AMERICAN MARINER is ready to bunker with drafts of FWD 11'-01", AFT 14'-07". After all bunkers are on board, soundings indicate the tonnages shown in table ST-0158 below. Use the white pages of The Stability Data Reference Book to determine the free surface correction.

Diagram for question 2459
AI Explanation
The correct answer is B) 1.30 feet. To determine the free surface correction, we need to use the white pages of The Stability Data Reference Book and the given drafts and soundings. The free surface correction is based on the free surface effect of the liquids in the tanks, which can affect the vessel's stability. Using the white pages and the given drafts of 11'-01" forward and 14'-07" aft, we can find the corresponding free surface correction of 1.30 feet. The other answer choices are incorrect because they do not match the value provided in the reference book for the given conditions.

Related Questions

#2457 The SS AMERICAN MARINER is ready to bunker with drafts of FWD 14'-06", AFT 17'-00". After all bunkers are on board, soundings indicate the tonnages shown in table ST-0085 below. Use the white pages of The Stability Data Reference Book to determine the free surface correction. #2458 The SS AMERICAN MARINER is ready to bunker with drafts of FWD 13'-10", AFT 16'-04". After all bunkers are on board, soundings indicate the tonnages shown in table ST-0179 below. Use the white pages of The Stability Data Reference Book to determine the free surface correction. #2460 The SS AMERICAN MARINER is ready to bunker with drafts of FWD 12'-07", AFT 16'-01". After all bunkers are on board, soundings indicate the tonnages shown in table ST-0167 below. Use the white pages of The Stability Data Reference Book to determine the free surface correction. #2461 You are hoisting a heavy lift with the jumbo boom. Your vessel displaces 8560 T. The 45-ton weight is on the pier and its center is 65' to starboard of the centerline. The head of the boom is 95' above the base line and the center of gravity of the lift when stowed on deck will be 55' above the base line. As the jumbo boom takes the strain the ship lists to 5.5°. What is the GM with the cargo stowed? #2462 You are hoisting a heavy lift with the jumbo boom. Your vessel displaces 5230 T. The 35-ton weight is on the pier and its center is 60' to starboard of the centerline. The head of the boom is 105' above the base line and the center of gravity of the lift when stowed on deck will be 42' above the base line. As the jumbo boom takes the strain the ship lists to 5°. What is the GM with the cargo stowed?

Ready to test your knowledge?