Question 449Deck Safety70% to pass
You must evacuate a seaman by helicopter lift. Which statement is TRUE?
AI Explanation
The correct answer is D) The hoist line should be slack before the basket or stretcher is hooked on.
This is correct because having a slack hoist line allows the basket or stretcher to be easily and safely hooked onto the helicopter's rescue device. A tight line could make it difficult to secure the litter, increasing the risk of injury to the evacuated seaman.
The other options are incorrect - A) stopping the ship with the wind off the beam is not necessary, B) the basket/stretcher should be allowed to gently touch the deck to avoid a dangerous drop, and C) securing the tending line beyond the helicopter blades is not required and could create additional hazards.
Related Questions
#447 When evacuating a seaman by helicopter lift, which course should the ship take? #448 When evacuating a seaman by helicopter lift, which statement is TRUE? #450 You must medevac a critically injured seaman by helicopter hoist. Which statement is TRUE? #451 A rescue helicopter's hoist area should have a radius of at least _______________.#452 A SAR helicopter has landed a litter on deck to medevac a patient from your vessel. After ensuring that it has been grounded, what precautionary action should you take prior to loading the patient into the litter?