Question 315General Subjects - 1st Asst/Chief70% to pass
A containership is scheduled to depart the Port of Houston, TX at 0600 on April 7th on a voyage to exceed 48 hours. What is the EARLIEST time that the steering gear could be tested prior to getting underway and be in compliance with the cargo and miscellaneous vessel regulations of 46 CFR?
AI Explanation
The correct answer is C) 1800 April 6th.
According to the cargo and miscellaneous vessel regulations in 46 CFR, the steering gear must be tested within 12 hours prior to the vessel getting underway on a voyage exceeding 48 hours. Since the vessel is scheduled to depart at 0600 on April 7th, the earliest time the steering gear could be tested and be in compliance is 1800 on April 6th, which is 12 hours before the scheduled departure.
The other options are incorrect because A) 0600 April 6th is more than 12 hours before departure, B) 1200 April 6th is less than 12 hours before departure, and D) 0000 April 7th is on the day of departure, which would not be within the 12-hour requirement.
Related Questions
#313 As a management level engineering officer planning for the departure of a vessel, what would be the preferred document to use to make sure that you did not miss any important steps? #314 When transitioning from maneuvering speed to full sea speed on a slow-speed diesel-powered vessel that features a direct-drive fixed-pitch propeller propulsion arrangement, how should this be accomplished? #316 As a management level engineering officer on a motor vessel equipped with engines capable of burning both high sulfur content residual fuels and low sulfur content distillate fuels, on departure from a US port, when would you plan for the fuel changeover be accomplished? #317 You are a management level engineering officer on a motor vessel. For departure planning purposes, when is the "standby" order typically rung? #318 A very large crude carrier is scheduled to depart of the Port of Long Beach, CA at 0800 on June 28th on a voyage to exceed 48 hours. What is the EARLIEST time that the communication means between the wheelhouse and the engine control room could be tested prior to getting underway and be in compliance with the tank vessel regulations of 46 CFR?