Question 350General Subjects - 1st Asst/Chief70% to pass
During a vessel dry-docking survey which of the following items are typically required by Class to be surveyed?
AI Explanation
The correct answer is C) Sea chests, tail shaft wear down readings and rudder assembly.
During a vessel dry-docking survey, the Class (the organization that certifies the vessel's compliance with safety and technical standards) typically requires the inspection of several key components. These include the sea chests (openings in the hull that allow water to enter the vessel's systems), the tail shaft wear down readings (to ensure the propeller shaft is not excessively worn), and the rudder assembly (to verify its proper functioning and structural integrity). This comprehensive inspection ensures the vessel's seaworthiness and compliance with the applicable regulations.
The other options are incorrect because they do not cover the full scope of the typical Class-required inspections during a dry-docking survey. Option A focuses only on sea chests and tail shaft wear down, while Option B and D omit key components like the sea chests or the tail shaft wear down readings.
Related Questions
#348 In accordance with international MARPOL Annex V regulations and federal regulations under 33CFR Subchapter O, the discharge of what category of garbage is prohibited in any waters? #349 In accordance with international MARPOL Annex V regulations and federal regulations under 33CFR Subchapter O, the prohibition of the discharge of dunnage, lining, and packing materials that float applies to a vessel operating within how many nautical miles of the nearest land? #351 As Chief Engineer you join a vessel enrolled in Continuous Machinery Survey. Approximately what percent of the machinery should be surveyed per year throughout the Special Survey cycle? #352 You are putting together a list of Class required work for a vessel's next special survey. Which of the following items would be required by Class? #353 The intermediate survey for a vessel is typically carried out at what point in the survey cycle?