To properly blow down a boiler gage glass, you should _______________.
AI Explanation
The correct answer is B) blow through the bottom (water) connection first.
The reasoning for this is that when blowing down a boiler gage glass, you should always start by blowing through the bottom (water) connection first. This ensures that any sediment or debris in the gage glass is flushed out before blowing through the top (steam) connection. Blowing through the bottom first prevents debris from being pushed up into the gage glass, which could damage or obstruct the glass.
The other options are incorrect - A) blowing through the top first is incorrect, C) tightening the packing nuts is unnecessary, and D) the cut-out valve chains should not be disconnected during normal gage glass blowdown procedures.
Related Questions
#52 The phrase 'boiler water column' as defined in the regulations, refers to the _______________.#53 In the absence of the manufacturer's instructions, a good procedure in reassembling a high-pressure boiler gage glass is to tighten the nuts in pairs and _______________.#55 The boiler water gage glasses should be blown down _______________.#56 You are standing watch in the engine room of a steam vessel. You should blow down a gage glass periodically to _______________.#57 How is boiler water forced to circulate faster in accelerated natural circulation boilers as compared to free natural circulation boilers?