In storm conditions, with the wind and waves from the port bow of the DEEP DRILLER in 600 feet water depth, the offset is 9%. Completely slacking mooring lines 5 and 6 reduces the offset to _______________.
AI Explanation
The correct answer is A) 6.5%.
In storm conditions with high winds and waves, the offset of the DEEP DRILLER in 600 feet of water depth is initially 9%. By completely slacking mooring lines 5 and 6, the offset is reduced to 6.5%. This is because slacking the mooring lines reduces the restraining force on the vessel, allowing it to drift and reduce the overall offset from its original position.
The other options are incorrect because: B) 5.0% is too low of an offset reduction, C) 2.5% is even lower and unlikely, and D) 0.0% would be an unrealistic complete elimination of the offset in these storm conditions.
Related Questions
#4276 The COASTAL DRILLER, when underway was loaded as shown in Sample Load Form #1 (Rig Move). It is now preloaded at minimum air gap waiting for all settling to take place. The preload, weighing 7,191.7 kips, has LM 870,196 ft-kips and TM 2,158 ft-kips. What is the starboard leg reaction? #4277 Standards for fabrication and testing of chain on mobile offshore drilling units are provided by the _______________.#4279 When removing the cap from a sounding tube on a MODU, the sound of air escaping indicates the tank _______________.#4280 Among the valves to open on the DEEP DRILLER, if you have to transfer ballast from Tank 1P to Tank 10S using #1 ballast pump, is valve _______________.#4281 On the DEEP DRILLER, among the port-side valves to open when deballasting from ballast tank 2P is valve _______________.